Renovation 101
Get answers to common questions about home remodeling, construction, permits, and our proven process.
Featured Videos

Kitchen Remodeling Transformation
Join Britton Neeley of Neeley Built Homes as he walks through a kitchen renovation in Ellijay, Georgia. The project involved extending the kitchen into the porch area, adding a significant 300 square feet to the space. Key highlights include: A new 8-foot island for added functionality and gathering space. Repurposed and refinished original cabinetry, saving around $4,000. Utilization of existing appliances to keep costs down. Structural changes with a 24-foot beam to support the opening of a load-bearing wall. Modern upgrades like quartz countertops, a farm sink with a filtration system, and under-cabinet lighting. Britton explains the renovation process, emphasizing both the aesthetic and practical improvements made to the home. For those interested in home remodeling in the Ellijay or Blue Ridge areas, Neeley Built Homes invites you to reach out with any questions or to discuss your own project.
All Videos

Join Britton as we showcase a recent remodel at Coosawattee River Resort in North Georgia where we transform a bedroom into a modern dining room.
Along the way, we:
Added a 10-ft beam to open up the layout. Raised the ceiling with a vaulted design for extra height. Installed double doors for easy indoor-outdoor access. Matched the existing pine floors for a cohesive look. Gave it a fresh, contemporary style that stands out. The homeowners are thrilled with the result, and we think you’ll love it too!

One of the most common questions we get is: How long does a kitchen remodel take? While the national average is 6–12 weeks, our team typically completes remodels in 5–6 weeks.
In this video, Britton shares key considerations for homeowners during the remodel process—like planning temporary meal prep areas and adjusting to life without a kitchen.
It's not always easy, but the results are worth it.

Turnkey contracts are fixed-price agreements that cover the full project, offering clarity and cost certainty with no surprise expenses. However, they require extensive upfront planning and investment before construction begins, which can be a hurdle. While some flexibility exists through allowances, it’s best to get a ballpark estimate first to decide if moving forward makes sense.

Watch for key red flags when choosing a contractor: missed appointments or poor communication, failure to follow up, lack of confidence or honesty about their skills, and not listening to your needs. Most importantly, trust your gut—clear communication and trust are essential for a successful project.

Cost Plus contracts mean you pay for materials, labor, and expenses plus a contractor fee. They offer flexibility and transparency, making them ideal for projects with unknowns, like additions—but costs can exceed estimates, so budgeting carefully is key. Since contractors manage project funds, trust and clear communication are essential when choosing this approach.

Before starting any home project, check with your local permitting office. Permits help ensure quality and prevent future legal issues, but they can add time, cost, and may increase property taxes. Stay informed, don’t skip permits if they’re required, and communicate clearly with your contractor to avoid surprises.